This report is based on the inspection carried out in the ETN workshops, on 22/04/2020.

According to 1064-12-ITP-02018 STEEL STRUCTURE MANUFACTURING REV01:

  • Activity Nº: Point 1.3.1A
  • Remarks: 100% VT
  • Action: W
  • Activity Nº: Point 1.3.1A
  • Remarks: 100% VT
  • Action: W
  • Activity Nº: Point 1.3.1A
  • Remarks: 100% VT
  • Action: W
  • Activity Nº: Point 1.3.1A
  • Remarks: 100% VT
  • Action: W

Asembly progress. It includes the verification of the presentations made of modules II, III and IV, in addition:

  • Header Boxes
  • Refractory anchors
  • Supports